Erosion Control Sankey Summit - 2018

This eroded bike track was repaired in 2018.

11/20/2024

B4C were contracted to repair this severely damaged section running straight down to the Brush Box track from Sankeys Summit. Use as a downhill bike track caused initial damage which was compounded by the effects of water run off. Coir Logs and straw bales were laid to halt the damage and provide a site for replanting of natives. our group followed up with occasional plantings in the areas just above the coir logs.

The photos show the area in 2017 before restoration, during restoration and now in November 2024.